Milestone

1993

Listed on Karachi, Lahore and Islamabad Stock Exchanges

1996

Entered into commercial business with production capacity of 1.2 million tons per annum (Lines A and B at Pezu Plant)

1999

Production capacity increased to 1.5 million tons per annum

2001

Conversion of Kiln Firing System from furnace oil to coal based

2002

Started exporting cement

2005

Started new production line (Line C) at Pezu
Inaugurated new production facility in Karachi
Became the largest cement exporter from Pakistan

2006

Started new production line (Line D) in Pezu
Started production in Karachi plant (Lines E and F)
Became largest cement producer of Pakistan.Acquired transportation fleet of bulkers and ship loaders

2007

Became the first company to export loose cement through sea

2008

Set up its own cement storage facility at Karachi Port with the capacity of 24,000 tons
Conversion of furnace oil power generation engines to gas-based
Got listed in London Stock Exchange and became the first cement company in Pakistan to issue GDR

2009

Started the 7th production line (Line G) at Karachi Plant, bringing the total production capacity to 7.75 million tons per annum

2010

Waste Heat Recovery Project started operations at both Karachi and Pezu Plants
Acquired multi-purpose trailers for moving all kinds of payload, either bagged or in raw form

2011

Signed MOU to sell 20 MW electricity to Hyderabad Electric Supply Company (HESCO)
Set up a plant at Karachi Plant to replace coal with Tyre Derived Fuel (TDF) to further reduce cost of production
Invested in a joint venture in DR Congo

2012

Started supplying electricity to HESCO.

Signed Lol for supply of electricity to PESCO.

Invested in a joint venture of cement grinding plant in Iraq.

Shares acquisition of ICI Pakistan limited.